Time and progress chart of a construction, is also known as
Bar chart
Gantt chart
Modified Mile stone chart
Critical path method chart
All the above.
Correct Answer:
All the above.
← Previous Question
Next Question→
More Questions from
Construction Management
The first method invented for planning projects, was
The difference between the time avail-to do a job and the time required to do the job, is known as
If to, tp and tm are the optimistic, pessimistic and most likely time estimates of an activity respectively, the expected time t of the activity will be
A critical ratio scheduling
A Milestone chart
Pick up the incorrect statement from the following:
If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be
Frederick W. Taylor introduced a system of working known as
If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the activity, is
The technique for establishing and maintaining priorities among the various jobs of a project, is known
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments