Construction Management Questions
In PERT/CPM network drawing conventions, identify the incorrect statement about how activities are represented by arrows and how networks are drawn.
In building delivery using modular coordination, which stages must be properly aligned to achieve efficiency and quality?
In time–cost analysis for a single activity, the time corresponding to the least possible direct construction cost of that activity is termed as:
In CPM network terminology, completion of an activity is generally represented as which network element?
On a construction site, what is the primary use of the Site Order Book maintained by field staff and visiting engineers?
In CPM scheduling, the critical path consists of those activities which have what value of total float?
In technical planning for construction projects, which actions are core objectives to ensure readiness and smooth execution?
In the context of a construction project, the term "construction team" commonly includes which stakeholders?
According to fundamental principles of organisation design for engineering projects, which set of principles is most appropriate for effective management?
Henry Gantt developed the concept of Bar Charts (later called Gantt Charts) for planning and scheduling of construction and industrial projects—identify the correct year from the options.
In public works and construction project management, the typical maximum sanctioning power of an Executive Engineer (financial approval limit) is up to which amount?
In project management, the Critical Path Method (CPM) is best described by which statement?
In PERT (Program Evaluation and Review Technique), which of the following is a valid event representation?
On a civil engineering project site, who is typically the overall in-charge responsible for execution and delivery of works?
A comprehensive construction schedule is prepared after collecting which sets of foundational planning data?
Identify the salient feature of a functional organisation structure in construction management.
In a project network, the artificial activity used solely to show dependency (that a following activity cannot start until a preceding one is complete) is called:
Which of the following best represents a project activity in scheduling and network analysis?
In civil engineering construction, which organisational form is most popularly used for managing projects?
Bar charts (Gantt charts) are best suited for representing smaller, well-defined construction or project tasks where activity interdependencies are minimal.