Estimating and Costing Questions
Brick walls are measured in sq. m if the thickness of the wall is
The cross-sections for a highway is taken at
The plinth area of a building not includes
The height of the sink of wash basin above floor level is kept
In case of laying gullies, siphons, intercepting traps, the cost includes
The concrete work for the following part of the building of specified thickness is measured in square metres
Cost of fittings and their fixing is specified for the following sanitary fittings
The area is measured correct to the nearest
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
Pick up the item whose weight is added to the weight of respective item, is
The cross-sectional area of the embankment of a canal fully in embankment in the given figure is
Referring of given figure, pick up the correct statement from the following:
Size, capacity and materials need be specified for
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
Pick up the correct statement regarding the centre line method of estimating a building
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
The measurement is made for stone work in square metre in case of
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is
Pick up the correct statement from the following: