The concrete work for the following part of the building of specified thickness is measured in square metres
Root slabs
Floors
D.P.C.
Wall panels
All the above.
Correct Answer:
All the above.
← Previous Question
Next Question→
More Questions from
Estimating and Costing
Cost of fittings and their fixing is specified for the following sanitary fittings
The area is measured correct to the nearest
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
Pick up the item whose weight is added to the weight of respective item, is
The cross-sectional area of the embankment of a canal fully in embankment in the given figure is
Referring of given figure, pick up the correct statement from the following:
Size, capacity and materials need be specified for
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
Pick up the correct statement regarding the centre line method of estimating a building
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended