According to IS (Indian Standard) method of measurement, what is the conventional order for booking dimensions?
Open
View answer
In a base (house) drainage system, inspection pits or chambers (small manholes) should be provided at which locations?
Open
View answer
Among common estimating methods (preliminary, plinth-area, cube-rate, detailed), which provides the most reliable and accurate cost estimate for a project?
Open
View answer
Which of the following items is NOT typically measured in square metres (sq.m) under standard methods of measurement?
Open
View answer
According to standard productivity norms, what is the expected out-turn for 12 mm thick cement plastering per mason per day (under normal site conditions)?
Open
View answer
For a protective embankment with mean height d, side slopes S:1 (horizontal:vertical), and length L, what is the area of one sloping face?
Open
View answer
In a plinth area estimate for buildings, which of the following items is NOT included within the plinth area measurement?
Open
View answer
A steel reinforcing rod of diameter D is subjected to a tensile (bar) stress of 1400 kg/cm^2, and the permissible bond stress in concrete is 6 kg/cm^2. In reinforced concrete anchorage design, determine the required development (bond) length expressed as a multiple of the bar diameter D.
Open
View answer
Select the correct prismoidal (Simpson’s) formula for volume between a series of equally spaced cross-sections: identify the proper weighting of odd and even intermediate areas relative to the first and last areas.
Open
View answer
Identify which types of brickwork are measured in square metres (area measurement) rather than cubic metres in standard quantity surveying practice.
Open
View answer
In reinforced concrete beams, the total length of a cranked (bent-up) bar that rises through a vertical distance d at a 45° angle, for a beam of effective length L, is taken as which of the following?
Open
View answer
For a highway formation having a uniform gradient over a length where the existing ground also has a longitudinal slope, which earthwork computation methods are acceptable for calculating quantities?
Open
View answer
As per common Indian Standard practice for domestic water-supply design, the peak (maximum) momentary draw-off per capita per minute is taken as which of the following values for the indicated number of users?
Open
View answer
When preparing a detailed cost estimate for a civil project, which factors must be considered to ensure realistic rates and accurate quantities?
Open
View answer
In method-of-measurement terminology, excavation exceeding 1.5 m in width and 10 sq.m in plan area but with a depth not exceeding 30 cm is termed as which type of item?
Open
View answer
In building measurement, brick walls are measured in square metres (area measurement) when the wall thickness is which of the following?
Open
View answer
In highway construction surveying, cross-sections for a road are typically taken at right angles to the centre line, at standard intervals (e.g., 30 m), at intermediate points where the gradient changes abruptly, and at the start-and-end points of curves. Which statement best captures this practice?
Open
View answer
In building estimation, identify the item that is NOT included in the plinth area of a building measured at floor level to the outside of walls.
Open
View answer
According to standard building services practice, what is the recommended installation height of a wash basin (sink) rim above the finished floor level?
Open
View answer
For laying gullies, siphons, and intercepting traps in building drainage, the quoted cost generally includes which components of work?
Open
View answer
Practice smarter