Estimating and Costing Questions
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is
Pick up the incorrect statement from the following:
Pick up the correct statement from the following:
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
According to ISI method of measurement, the order of the sequence is
The inspection pit or chamber is a manhole provided in a base drainage system
The most reliable estiamte is
The measurement is not made in square metres in case of
The expected out turn of 12 mm plastering with cement mortar is
The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is
Pick up the item of work not included in the plinth area estimate
If tensile stress of a steel rod of diameter D is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is
The correct prismoidal formula for volume is
The brick work is measured in sq metre, in case of
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
The main factor to be considered while preparing a detailed estimate, is
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as