Home » Civil Engineering » Estimating and Costing

The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is

Correct Answer: 3225 m3

← Previous Question Next Question→

Discussion & Comments

No comments yet. Be the first to comment!
Join Discussion