Determinants of the rate of an item of work (civil estimation) Which factors does the unit rate of an item of work depend on in rate analysis and estimation?
Centre-line method in estimation — suitable building shapes For which plan geometries is the centre-line method especially convenient and efficient for quantity estimation?
Anti-siphonage connection for a water closet (W.C.) In sanitary plumbing, to prevent trap seal loss due to siphonage, the anti-siphonage (vent) pipe is connected to which location relative to the P-trap of the W.C.?
Estimation & Measurement – Identify the incorrect rule In civil engineering quantity measurement (as per standard practice like IS 1200), which of the following statements about deductions is NOT correct?
Highway Embankment – Cross-sectional area (no camber) For a highway embankment with formation width B, height d, and side slope S:1 (horizontal:vertical), and with no transverse slope (no camber), what is the cross-sectional area?
Rate Units – Items paid per 100 cubic metres (% cu m) For which of the following items is the rate commonly quoted per 100 m^3 (also written as per “% cu m”)?
Plumbing Measurement – Pipe classification and measurement rules Which of the following statements about pipe works and their measurement is correct?
Estimating Basics – Contingencies, work-charged staff, detailed specs, and market rate Which of the following statements is correct in the context of preparing detailed estimates?
Sanitation – Trap that disconnects a house drain from the public sewer What is the name of the trap installed to isolate the house drainage system from the street sewer, usually inside an intercepting chamber near the property boundary?
Payment Units – Common materials and their standard units in BOQ Which of the following statements correctly pairs the material with the usual unit of payment?
Productivity – Expected out-turn for a half-brick partition wall What is the typical expected out-turn (productivity) per mason per day for constructing a half-brick (about 115 mm thick) partition wall?
Building Area Metrics – What carpet area excludes Carpet area is the usable floor area within the internal finished faces of walls. Which of the following are excluded from carpet area for the purpose of traditional building estimation?
Quantity Surveying – When is brickwork NOT measured in cubic metres? In civil engineering measurement (IS 1200 practice), brickwork items are generally measured by volume (cubic metres). Identify the case where brickwork is measured by area instead, and therefore should NOT be taken in cubic metres.
Building Bye-laws – Inclusion of balcony in floor area/FAR computation For the purpose of calculating permissible floor area or Floor Area Ratio (FAR), up to what percentage of a balcony's area is typically counted towards the floor area in standard Indian practice (unless a local rule states otherwise)?
Earthwork Measurement – Items not measured separately Which of the following operations associated with earthwork are generally deemed to be included in the earthwork rate and therefore are not measured separately for payment?
Units of Measurement – When is square metre (m^2) used? Choose the item that is typically measured in square metres for BOQ purposes (with thickness specified), rather than in cubic metres, numbers, or tonnes.
Plumbing Detailing – Slope of P-trap outlet below horizontal In sanitary plumbing, the outlet of a P-trap is laid with a small downward inclination to ensure self-cleansing flow. What is the standard slope angle of the P-trap outlet below the horizontal used in practice?
Earthwork – Statements that are correct regarding excavation and embankment Which of the following statements correctly describe standard practice for earthwork operations and measurement?
Lead in Earthwork – Identify the incorrect statement Consider the following statements about lead (horizontal hauling distance) in earthwork measurement and payment. Which statement is incorrect as per common IS-style practice?
Productivity – Out-turn of excavation by one mazdoor per day in ordinary soil What is the expected out-turn (quantity of earthwork) that one mazdoor can excavate in ordinary soil in one working day under normal conditions?