Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Estimating and Costing Questions
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
Pick up the correct statement from the following:
The area of the cross-section of a road fully in banking shown in the given figure, is
The assumption on which the trapezoidal formula for volumes is based, is
Pick up the incorrect statement regarding a master trap from the following :
In the mid-section formula
The item of steel work which is measured in sq.m, is
Pick up the excavation where measurements are made in square metres for payment.
The order of booking dimensions is
The item of the brick structure measured in sq.m, is
The expected out turn of 2.5 cm cement concrete floor per manson per day
The detention period in a septic tank is assumed
Pick up the correct statement in case of water supply.
The volume is measured correct to the nearest
While preparing a detailed estimate
The minimum width of a septic tank is taken
Pick up the correct statement from the following:
While estimating a reinforced cement structure, the omitted cover of concrete is assumed
The damp proof course (D.P.C.) is measured in
The value of 'C' of Indian type W.C. shown in the given figure is :
1
2
3
4
5