The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
1.00 m3
1.25 m3
1.50 m3
1.75 m3
Correct Answer:
1.25 m3
← Previous Question
Next Question→
More Questions from
Estimating and Costing
Pick up the incorrect statement from the following:
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is
Pick up the correct statement from the following:
While estimating the qualities for the construction of a building, the correct metric unit is
The rate of an item of work depends on
The 'centre line method' is specially adopted for estimating
Anti-siphonage pipe is connected to
Pick up the correct statement from the following:
Pick up the incorrect statement from the following:
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments