Statistics for engineers: Which statements about frequency distribution curves are correct?
Open
View answer
Project lifecycle – first stage: In the lifecycle of a construction project, which is typically the very first stage?
Open
View answer
PERT vs. CPM orientation: Which statement correctly distinguishes the orientation of PERT and CPM techniques?
Open
View answer
PERT time estimates: In PERT, optimistic, pessimistic, most likely, and expected time estimates refer to what?
Open
View answer
CPM network times: Which statements are correct regarding earliest and latest times for activities and events in CPM?
Open
View answer
Float concepts in CPM: Which of the following statements about total float, free float, independent float, and interfering float are correct?
Open
View answer
The three time estimates for the activities of the network shown in the given figure are shown above their arrows. The earliest expected time for the event 4, is
Open
View answer
Project scheduling notation in PERT/CPM Which of the following statements about standard time notations and obligations in network planning is correct?
Open
View answer
PERT basics – what is PERT and how is it characterized? Choose the most complete description of the Program Evaluation and Review Technique (PERT).
Open
View answer
A goiden rule for the procurement of construction stones, suggests
Open
View answer
Events vs activities in network planning Which of the following best represents an event (i.e., a zero-duration milestone state) rather than an activity?
Open
View answer
Who can be a contractor for executing a project? Identify the most inclusive description of a contractor involved in project execution.
Open
View answer
Final selection of a construction site – who decides? In standard public works practice, which stakeholders collectively lead to the final selection of a construction site?
Open
View answer
Floats in network analysis – identify the incorrect statement Which of the following statements about total float and free float is incorrect?
Open
View answer
For the network shown in the given figure, the expected time for the activity
Open
View answer
Optimistic time, most likely time and pessimistic times for the activities of a network in the given figure are written above their arrows. If the contractual obligation time for the project is 75, the latest occurrence time for the event 2, is
Open
View answer
Classification in construction management: How are residential buildings generally categorized? In construction planning and estimation, residential buildings (houses, apartments, hostels) are typically treated as which class of construction based on size, loading, and resource intensity?
Open
View answer
Project classification: Railway projects are treated as what type of construction? In civil engineering project management, how are railway projects (permanent way, yards, bridges, station works) typically categorized based on scale and resource intensity?
Open
View answer
PERT/CPM notation: How is an event represented on a network diagram? In activity-on-arrow (AOA) or activity-on-node (AON) conventions, the event (milestone) is indicated by a number enclosed in which geometric shape?
Open
View answer
Float characteristics on the critical path In Critical Path Method (CPM), a critical activity’s float value is equal to what?
Open
View answer