The final selection of a construction site, is done by
departmental representative or user
local civil authority representative
representative of engineer authority
representative of administration
all the above.
Correct Answer:
all the above.
← Previous Question
Next Question→
More Questions from
Construction Management
Pick up the incorrect statement from the following:
For the network shown in the given figure, the expected time for the activity
Optimistic time, most likely time and pessimistic times for the activities of a network in the given figure are written above their arrows. If the contractual obligation time for the project is 75, the latest occurrence time for the event 2, is
Residential buildings are treated as
Railway projects are treated as
An event is indicated on the network by a number enclosed in
The critical activity has
If t is the duration of an activity, t1 is the latest finish possible moment of its preceding activity and t2 is the earliest start possible moment, the independent float of the activity is
While scheduling a project by C.P.M.
Power stations are generally treated as