Construction Management Questions
Independent float formula with clear event times For an activity i→j of duration t, let L_i be the latest event time at its start (tail) and E_j be the earliest event time at its finish (head). If we denote t1 = L_i and t2 = E_j, what is the independent float (IF)?
Scheduling a project by CPM: What are the essential steps? When preparing a CPM schedule for an engineering project, which set of actions correctly describes the overall process?
Project classification: How are power stations generally treated? Considering typical scope (civil, structural, mechanical, electrical, and control systems), a power station falls under which class of construction project?