A critical ratio scheduling
establishes the relative priorities among various activities on a common basis
determines the status of each activity
adjusts automatically changes in activity progress
is a dynamic system
none of these.
Correct Answer:
none of these.
← Previous Question
Next Question→
More Questions from
Construction Management
A Milestone chart
Pick up the incorrect statement from the following:
If the total float and duration of an activity are 5 and 10 days respectively, the particular activity can be
Frederick W. Taylor introduced a system of working known as
If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the activity, is
The technique for establishing and maintaining priorities among the various jobs of a project, is known
Pick up the correct statement from the following:
If TL is the latest allowable event occurrence time, total activity slack(s), is equal to
Works costing less than Rs. 20,000 are treated as
Various activities of a project, are shown on bar charts by