CPM/PERT logic: A dummy activity becomes critical when its earliest start equals its latest finish. Is this statement correct?
In facilities planning, a “process layout” (also called a functional layout) groups similar machines together. Which drawbacks typically arise in such a layout? Choose the most complete statement.
Inventory control: What is the most important overarching function of an inventory control system in a manufacturing organisation?
Linear programming basics: A “feasible solution” to an LP model must do which of the following?
Project management: In general practice, is PERT preferred over CPM for project evaluation when activity times are uncertain (e.g., R&D, new product development)?
Queuing theory: Which distribution most commonly models service time for basic M/M/1-type systems?
Time study in industrial engineering is used primarily to achieve which set of outcomes?
Applications of PERT: PERT is best suited to which of the following categories of projects?
Queuing analysis: Is it appropriate to use Monte Carlo simulation for queueing problems that resist closed-form mathematical analysis?
Designing a wage incentive plan: Which factors must be considered to ensure fairness, adoption, and effectiveness?
Network scheduling terminology (PERT/CPM): The start or completion of a task (with no duration itself) is called a(n) ________.
Quality and Manufacturing Systems: definition of process capability for a machine tool In industrial engineering, the process capability of a machine is defined as the machine’s inherent ability to consistently achieve which of the following outcomes over time?
Work-Factor (WF) / PMTS application: where is abbreviated Work-Factor data typically used? Select the most appropriate application area(s) for Abbreviated Work-Factor (AWF) data within Predetermined Motion Time Systems.
Break-even chart interpretation: where is publicity (advertising) expenditure represented? A company spends a substantial, largely time-based amount on sales publicity. In a standard break-even chart, this expenditure is depicted as belonging under which cost line/category?
Work measurement terminology: what is “performance rating” mathematically? In time study, performance rating relates the observed worker pace to the defined normal performance. Which expression best represents the performance rating factor?
Plant layout analysis tools: which charts support layout design decisions? Identify the chart(s) commonly employed when designing or improving a plant layout and material flow.
Organizational structure for large-scale automobile manufacturing Which organisational form is generally preferred for a large automobile manufacturing enterprise to combine clear authority with specialist support?
Predetermined Motion Time Systems (PMTS): members of the PMTS family Which of the following systems are classified under PMTS used for setting standard times without a stopwatch?
Purpose of Work Study: what is it mainly aimed at achieving? Select the option that best captures the principal aim of Work Study (method study + time study) in industrial engineering.
Cost–volume relationships: statement about break-even analysis Evaluate the statement: “Break-even analysis represents the relationship between cost and volume.”