Work measurement (objectives): What is the main objective of conducting work measurement studies in manufacturing and services?
Critical Path Method (CPM) in project management Which of the following best describes the capabilities and benefits of CPM when planning and controlling projects?
Wage incentive plans “The bonus increases in proportion to the increase in efficiency.” This statement applies to which plan?
A–B–C analysis in inventory control Which statements correctly describe A–B–C analysis used in materials management?
Rowan plan vs. 50–50 Halsey plan For which relationship between actual time and standard time do both plans yield the same worker earnings?
Work study techniques and tools Work study (method study and time study) is conducted using which of the following?
Rowan plan (wage incentives) According to the Rowan plan, how is the bonus paid to a worker determined?
Cost accounting – indirect expenses Which of the following are classified as indirect expenses (overheads)?
Perpetual inventory control In a perpetual inventory system, stock levels are monitored continuously and action is triggered as the stock approaches which level?
Linear programming (LP) applicability Which conditions are necessary to apply linear programming to a decision problem?
Break-even analysis – definition At the break-even point of an operation or business, which relationship holds true?
Operations management: By which single action can the production cost per unit be most directly reduced, without increasing the quantity of inputs used?
Project scheduling (CPM/PERT): Which statements correctly describe a network diagram's basic notation for activities and events?
Production planning and control: In manufacturing, what does “routing” specifically determine?
Time study definitions: Is the normal time greater than the standard time for a task?
Production types: Which statements are typically true for jobbing (job shop) production?
Network analysis (CPM/PERT): Can activity slack (float) take positive, zero, or negative values?
CPM time definitions: Earliest finish time (EF) of an activity equals which time relationship?
Manufacturing management terminology: In PPC, what does “Dispatching” mean?
Work measurement: Time study aims to determine the job time required by which level of worker performance?