Industrial Engineering and Production Management Questions
When slack of an activity is zero, the activity is critical and any delay in its performance will delay the completion of the whole project.
The main objective of work measurement is to
Critical path method
The bonus increases in proportion to the increase in efficiency. This statement applies to
A-B-C analysis
Both Rowan plan and 50-50 Halsey plan will provide the same earning when the actual time is __________ the standard time.
The work study is done by means of
According to Rowan plan of wage incentive system, bonus is paid to a worker
Indirect expenses include
In perpetual inventory control, the material is checked as it reaches its
Which of the following conditions are necessary for applying linear programming?
At the break even point,
The production cost per unit can be reduced by
Which of the following statement is correct about the network diagram?
Routing
In time study, normal time is more than the standard time.
In jobbing production
Slack may be positive, zero or negative.
Earliest finish time can be regarded as
In manufacturing management, the term 'Dispatching' is used to describe