Industrial Engineering and Production Management Questions

Practice Industrial Engineering and Production Management MCQs with answers and explanations. Page 5 of 9.

Category
Mechanical Engineering
Topic
Industrial Engineering and Production Management
Page
5 / 9
Mode
Practice

Questions

Open any question to view the answer and explanation.

Micromotion study in work measurement refers to which of the following?
Open
View answer
Project Management (CPM/PERT): role of dummy activities in a network diagram In network planning (arrow diagrams), why are dummy activities introduced into the CPM/PERT network?
Open
View answer
Facilities planning: the most suitable layout for manufacturing large steam turbines Which type of plant layout is typically used when producing very large, heavy products such as steam turbines that are difficult to move during fabrication?
Open
View answer
Classical management: organizational system introduced by F. W. Taylor Frederick Winslow Taylor is credited with introducing which form of organizational structure as part of scientific management?
Open
View answer
Break-even analysis between two manufacturing alternatives Two alternatives can produce the same product. Method 1: fixed cost = Rs. 2,000, variable cost = Rs. 20 per piece. Method 2: fixed cost = Rs. 1,500, variable cost = Rs. 30 per piece. At what output quantity (pieces) do the total costs break even between the two methods?
Open
View answer
Production planning & control (PPC): job-order vs mass production Evaluate the statement: “The planning and scheduling of job-order (job shop) manufacturing differ significantly from planning and scheduling of mass production.”
Open
View answer
CPM/PERT basics: meaning of an event (node) in a network Evaluate the statement: “An event is a function of two or more activities.”
Open
View answer
When is product layout most appropriate? Identify the manufacturing situation in which a product (line) layout is best suited.
Open
View answer
PERT probability: likelihood of meeting a 20-day target on the critical path A PERT network has three activities on the critical path with mean times 3, 8, and 6 days and standard deviations 1, 2, and 2 days respectively. What is the probability that the project will be completed within 20 days?
Open
View answer
Production control terminology: does follow-up prescribe the operation sequence? Evaluate the statement: “Follow-up prescribes the sequence of operations to be followed.”
Open
View answer
Materials handling: when are conveyors the preferred transport method? Conveyors are most suitable when which of the following conditions prevail for material movement?
Open
View answer
Project scheduling (CPM): Which of the following statements about slack, cost minimization, and the critical path is correct?
Open
View answer
Work study: What is the primary purpose of micromotion study in industrial engineering?
Open
View answer
CPM terminology: Slack (total float) represents the difference between which pair of schedule times for an activity?
Open
View answer
Production scheduling: Which factors must be considered when preparing a feasible and efficient schedule?
Open
View answer
Wage incentives: In Emerson’s efficiency plan, when is a worker paid a bonus?
Open
View answer
Facility layout: Which statement best describes a key advantage of product (line) layout?
Open
View answer
Human resource evaluation: Merit rating is a method for determining the…
Open
View answer
Project management acronyms: PERT stands for which of the following?
Open
View answer
CPM statement check: If an activity’s slack (total float) is zero, the activity is critical and any delay will delay the project completion. Is this statement correct?
Open
View answer