In order to check up the average depth of excavation, 'Dead mans' are left at the mid-widths of borrow pits
The earthwork calculation in excavation is made from the difference in levels obtained with a level
The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers
All the above.
Correct Answer:
All the above.
← Previous Question
Next Question→
More Questions from
Estimating and Costing
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
The value of 'B' of Indian type W.C. shown in the given figure is :
Pick up the incorrect statement from the following:
The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is
The unit of measurement is per quintal for the following:
For the construction of buildings, the subheads of the estimate are
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is
The weight of an item is measured correct to nearest
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments