Pick up the incorrect statement from the following:
No deduction is made for the volume occupied by reinforement
No deduction is made for the openings upto 0.1 sq.m
No deduction is made for volumes occupied by pipes, not exceeding 100 sq.cm in cross-section
No deductions are made for the ends of dissimilar structures up to 500 sq.cm cross-sectional area
None of these.
Correct Answer:
None of these.
← Previous Question
Next Question→
More Questions from
Estimating and Costing
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is
The rate of payment is made for 100 cu m (per % cu m) in case of
Pick up the correct statement from the following:
Pick up the correct statement from the following:
The trap which is provided to disconnect the house drain from the street sewer is called
Pick up the correct statement from the following:
The expected out turn of half brick partition wall per mason per day is
The value of 'A' of Indian type W.C. shown in the given figure is :
Carpet area does not include the area of
The brick work is not measured in cu m in case of