The following item of earth work is not measured separately.
Setting out of works
Site clearence
dead men
Steps in deep exavaction
All the above.
Correct Answer:
All the above.
← Previous Question
Next Question→
More Questions from
Estimating and Costing
The measurement is made in square metre in case of
The slope of the oultet of 'P trap' below the horizontal is kept
Pick up the correct statement from the following:
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
The value of 'B' of Indian type W.C. shown in the given figure is :
Pick up the incorrect statement from the following:
The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is
The unit of measurement is per quintal for the following:
For the construction of buildings, the subheads of the estimate are
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments