? In 2/3h, 1 article is made.
? In 1h, 3/2 article are made.
? In 71/2 = 15/2h, 3/2 x 15/2 = 45/4 article are made.
? Required articles = 45/4 = 112/4
Let the required number of days be N.
Let men, More days (indirect proportion)
8 : 12 : : 24 : N
? N = (12 x 24)/8 = 36 days
? Price of m articles = ? n
? Price of 1 article = ? n/m
? Price of 5 articles = ? 5n/m
For 50 students, food is sufficient for 45 days
? For 1 student, food is sufficient for 45 x 50 days
and for 75 students, food is sufficient for (45 x 50)/75 days. i,e., for 30 days.
Since 6 identical machines in 1 minute can produce a total of 270 bottles.
? 1 identical machines in 1 minute can produce a total of 270 / 6 bottles.
? 10 identical machines in 1 minute can produce a total of 270 x 10 / 6 bottles.
? 10 identical machines in 4 minute can produce a total of 270 x 10 x 4 / 6 bottles.
? 10 identical machines in 4 minute can produce a total of 45 x 10 x 4 bottles.
? 10 identical machines in 4 minute can produce a total of 1800 bottles.
According to question,
A shadow of length 40.25 meters is build for a height of 17.5 meters.
A shadow of length 1 meters is build for a height of 17.5 /40.25 meters.
A shadow of length 28.75 meters is build for a height of 17.5 x 28.75 /40.25 meters.
A shadow of length 28.75 meters is build for a height of 17.5 x 2875 /4025 meters.
A shadow of length 28.75 meters is build for a height of 17.5 x 575 /805 meters.
A shadow of length 28.75 meters is build for a height of 17.5 x 115/161 meters.
A shadow of length 28.75 meters is build for a height of 12.5 meters.
Let the required number of days be N.
Remaining work = 1 - 5/8 = 3/8
Less work, Less days (Direct proportion)
5/8 : 3/8 : : 20 : N
? N = (3/8) x 20 x 8/5
? N = 12 days
Let the required length be L m.
More men, More length (Direct proportion)
Less days, Less length (Direct proportion)
Men 20 : 70
Days 6 : 3
? (20 x 6 x L) = (70 x 3 x 56)
? L = (70 x 3 x 56) / (20 x 6) = 98 m
? 22 men do the work in 16 days.
? 1 man will do the work in 16 x 22 days.
? 32 men will do the job in = (16 x 22)/32 days
? Required number of days = (16 x 22)/32 = 11 days
Here M1 = 30, D1 = 16,
T1 = 9, M2 = 36 and T2 = 8
By formula, M1D1T1 = M2D2T2
30 x 16 x 9 = 36 x D2 x 8
? D2 = (30 x 16 x 9)/(36 x 8) = 15 days
? For 1000 men, provision lasts for 48 days.
? For 1 men, provision lasts for (48 x 1000) days.
? For (1000 + 600) men, provision will last for (48 x 1000)/1600 days.
? Required number of days = (48 x 1000)/1600 = 3 x 10 = 30
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.