A takes twice as long as B to finish a job, and C takes three times as long as B. Working together, they finish the job in 12 days. How many days would A take to do the job alone?
Ten men and eight women together complete a work in 5 days. One woman’s 1-day work equals half of one man’s 1-day work. In how many days will four men and six women complete the same work?
Five men started a job expected to be done in 15 days. After 5 days, 10 women joined them and together they finished in the next 5 days. If 10 women alone had started the job, in how many days would they have completed it?
A contract is to be completed in 50 days with 105 men working 8 hours per day. After 25 days, only 2/5 of the work is finished. If each man now works 9 hours per day, how many additional men are required to complete the work on time?
Fourteen men and twelve boys finish a work in 4 days, while eight men and sixteen boys finish the same work in 5 days. Compare the 1-day work of 1 man with that of 1 boy (expressed as a ratio of man to boy).
In a factory there are equal numbers of women and children. Women work 6 hours per day and children work 4 hours per day. During festival time, workload increases by 50%. By rule, children cannot work more than 6 hours per day. If women and children are equally efficient per hour and the extra work must be absorbed by women, how many extra hours per day must each woman work?
Three women and eighteen children together complete a work in 2 days. If six women alone can complete the same work in 3 days, then how many days will nine children alone take to finish the work?
A contractor plans to finish a work in 124 days with 120 men. After 64 days, 2/3 of the work is complete. How many men can be dismissed so that the work still finishes on time?
A contract must be finished in 92 days by 234 men working 16 hours per day. After 66 days, 4/7 of the work is completed. If each man now works 18 hours per day, how many additional men are needed to finish on time?
A, B, and C can finish a work in 16, 32, and 48 days, respectively. They all start together. A works until completion; C leaves 2 days before the work is finished; B leaves 1 day before completion. In how many days is the work completed?
Rashmi can complete a work in 16 days, Ravina in 12 4/5 (12.8) days, and Gitika in 32 days. They start together; Rashmi leaves after 4 days, and Ravina leaves 3 days before completion. How long does the work take in total?
A can do a piece of work in 10 days, B in 15 days. They work together for 5 days, the rest of the work is finished by C in two more days. If they get Rs. 3000 as wages for the whole work, what are the daily wages of A, B and C respectively (in Rs):
A, B and C can do a piece of work in 24 days, 30 days and 40 days respectively. They began the work together but C left 4 days before the completion of the work. In how many days was the work completed?
12 men can complete a work in 8 days. 16 women can complete the same work in 12 days. 8 men and 8 women started working and worked for 6 days. How many more men are to be added to complete the remaining work in 1 day?
P can complete a work in 12 days working 8 hours a day.Q can complete the same work in 8 days working 10 hours a day. If both p and Q work together,working 8 hours a day,in how many days can they complete the work?
A and B can do a piece of work in 30 days , while B and C can do the same work in 24 days and C and A in 20 days . They all work together for 10 days when B and C leave. How many days more will A take to finish the work?
A can do a certain work in the same time in which B and C together can do it.If A and B together could do it in 20 days and C alone in 60 days ,then B alone could do it in:
A works twice as fast as B.If B can complete a work in 18 days independently,the number of days in which A and B can together finish the work is:
A Contractor employed a certain number of workers to finish constructing a road in a certain scheduled time. Sometime later, when a part of work had been completed, he realised that the work would get delayed by three-fourth of the scheduled time, so he at once doubled the no of workers and thus he managed to finish the road on the scheduled time. How much work he had been completed, before increasing the number of workers?
A,B,C together can do a piece of work in 10 days.All the three started workingat it together and after 4 days,A left.Then,B and C together completed the work in 10 more days.In how many days can complete a work alone ?
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28