Two-worker collaboration: X alone completes a job in 12 days. Together, X and Y complete the job in 6 2/3 days. In how many days can Y alone finish the job?
Man-days scaling to a fraction of a day: 10 men can build a wall in 8 days. How many men are required to complete the same work in half a day (assume identical efficiency)?
Mixed workforce (men and women): 3 men can finish a job in 6 days and 5 women can finish the same job in 18 days. If 4 men and 10 women work together, how many days will they require to finish the job?
Men and children together: 3 men can do a work in 18 days; 6 children can do the same work in 18 days. How many days will 4 men and 4 children together need to finish the work?
Three-person collaboration: P can do a work in 12 days, Q alone in 8 days, and with the help of R they finish in 4 days. How many days would R alone take to complete the work?
Staggered start in work: A alone can finish a job in 15 days, and B alone can do it in 10 days. A starts the work and B joins after 5 days. For how many total days did the work last until completion?
Efficiency comparison: A does 20% less work than B (i.e., A’s rate is 20% lower). If A can complete the job in 7.5 hours, in how many hours can B complete the same job?
Relative efficiency increase: X can complete a work in 16 days. If Y’s efficiency is 60% more than X’s efficiency, in how many days can Y complete the same work?
Men and women together with partial information: 2 men and 3 women finish 25% of a job in 4 days. Also, 6 men and 14 women finish the whole job in 5 days. In how many days will 20 women finish the entire work?
Determine a woman’s solo time from a mixed team: 10 men and 15 women finish a work in 6 days. One man alone can finish the same work in 100 days. In how many days can one woman alone finish the work?
Share in contract work: A, B and C contract to complete a work for Rs. 550. Together A and B are supposed to do 7/11 of the work. What should be C’s share of the payment?
Time and Work — Individual vs. Combined Rates A can complete the work alone in 6 days, and B can complete the same work alone in 3 days. If A and B work together from start to finish, in how many days will they complete the entire work?
Work Rates — Isolating One Worker's Time from Group Data Ram, Dilip, and Shekhar together complete a job in 20 days. Ram and Dilip together complete the same job in 30 days. How many days would Shekhar alone take to complete the job?
Three Workers with Different Efficiencies Sunil completes the work in 4 days, Dinesh in 6 days, and Ramesh works 1.5 times as fast as Sunil. If all three work together from the start, how many days are required to finish the work?
Staggered Start — One Worker Joins Later Mahesh and Umesh can complete a job in 10 days and 15 days, respectively. Umesh works alone for the first 5 days, after which Mahesh also joins. In how many total days is the work completed?
Two Workers — Partial Contribution Then Solo Finish A can do the work in 80 days. He works alone for 10 days, and then B alone finishes the remaining work in 42 days. If A and B worked together from the start, in how many days would they finish?
Staggered Collaboration — B Joins After 10 Days A can complete a job in 25 days and B can complete it in 20 days. A starts alone and B joins after 10 days. What is the total duration of the work (in days)?
Team Size Changes Midway 14 men can complete a work in 12 days. After 4 days, 2 more men join. How many additional days are needed to complete the remaining work?
Mid-Project Replacement and Net Team Size 12 men can finish a job in 9 days. After 3 days, 6 men join to replace 2 men (net change in team size). How many more days are needed to finish the remaining work?
Three People Working Together A can do a job in 8 days, B can do it in 16 days, and C can do it in 80 days. If all three work together, how many days are needed to complete the work?