A goiden rule for the procurement of construction stones, suggests
100% at the site
67% at the site and 33% under procurement
50% at the site and 50% under procurement
33% at the site and 67% under procurement
none of these.
Correct Answer:
67% at the site and 33% under procurement
← Previous Question
Next Question→
More Questions from
Construction Management
Events vs activities in network planning Which of the following best represents an event (i.e., a zero-duration milestone state) rather than an activity?
Who can be a contractor for executing a project? Identify the most inclusive description of a contractor involved in project execution.
Final selection of a construction site – who decides? In standard public works practice, which stakeholders collectively lead to the final selection of a construction site?
Floats in network analysis – identify the incorrect statement Which of the following statements about total float and free float is incorrect?
For the network shown in the given figure, the expected time for the activity
Optimistic time, most likely time and pessimistic times for the activities of a network in the given figure are written above their arrows. If the contractual obligation time for the project is 75, the latest occurrence time for the event 2, is
Classification in construction management: How are residential buildings generally categorized? In construction planning and estimation, residential buildings (houses, apartments, hostels) are typically treated as which class of construction based on size, loading, and resource intensity?
Project classification: Railway projects are treated as what type of construction? In civil engineering project management, how are railway projects (permanent way, yards, bridges, station works) typically categorized based on scale and resource intensity?
PERT/CPM notation: How is an event represented on a network diagram? In activity-on-arrow (AOA) or activity-on-node (AON) conventions, the event (milestone) is indicated by a number enclosed in which geometric shape?
Float characteristics on the critical path In Critical Path Method (CPM), a critical activity’s float value is equal to what?
Discussion & Comments
No comments yet. Be the first to comment!
Posting…
Name
Comment
Post Comment
Join Discussion
Discussion & Comments