High pressure grouting is generally restored for concreting in the lining if the rock strata is:
highly fissured
poor
likely to get seepage of water
All of the above.
Correct Answer:
All of the above.
← Previous Question
Next Question→
More Questions from
Tunnelling
The most commonly adopted pattern of cut holes is :
For highways, tunnelling is preferred to if the open cut exceeds :
The cut of a tunnel face is shown in given figure. This is called
The tunnels, the artificial underground passages are constructed for :
The length of the needle beam used in needle beam method of tunnelling is usually
For hauling muck from the tunnel, the following type of muck-car is used :
In case of drift method of tunnelling, the drift may be excavated at
Which one of the following methods is generally used for the layout of the muck-car tracks
Which one of the following methods of tunnelling does not require the use of time bearing :
Which one of the following statements is not correct for heading and benching method of tunnelling?