Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Railways
Boxing of ballast is done
under rails
at the rails
in between two rails
in between two sleepers.
Correct Answer:
at the rails
← Previous Question
Next Question→
More Questions from
Railways
If α is switch angle and R is radius of the turnout, the length of the tongue rail, is
A welded rail joint is generally
For holding a rail in position, no chairs are used for
Pot sleepers are in the form of
Pick up the correct statement from the following :
If absolute levels of rails at the consecutive axles A, B, and C separated by 1.8 metres are 100.505 m, 100.530 m, and 100.525 m respectively, the unevenness of rails, is
Best wood for wooden sleepers is
Safe speed (V) on a curve of radius 970 metres provided with two transition curves on Board Gauge track, is
Arrangement made to divert the trains from one track to another, is known as
In India the rails are manufactured by
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments