Pick up the incorrect statement from the following:
Tresguet did not provide the top camber for the drainage of surface water
Tresguet provided the top camber for the drainage of surface water
Telford provided two layers of stones in the central 5.4 m width and one layer was provided on the sides
Macadam provided a camber to the formation at the dug-up state, to drain percolated water.
Correct Answer:
Tresguet did not provide the top camber for the drainage of surface water
← Previous Question
Next Question→
More Questions from
Highway Engineering
If W is the weight of a vehicle negotiating an upgrade 1 : S along a track having co-efficient of resistance μ, the tractive force T is given by
According to IRC : 52-1973, for a single lane National Highway in hilly region,
Reinforcement in cement concrete slab of road pavements, is placed
Road width 8.8 m of two lane National highways or State highways in mountainous terrain
For maximum strength and durability minimum percentage of cement, by weight is
If L is the length of a moving vehicle and R is the radius of curve, the extra mechanical width b to be provided on horizontal curves,
Reconnaissance is best done with the help of
Curves in the same direction separated by short tangents, are called
Bottom-most component of a flexible pavement, is
In ideal pavement is constructed with