Open test pit is only suitable upto a depth of
2 metres
2.5 metres
3 metres
none of the above.
Correct Answer:
3 metres
← Previous Question
Next Question→
More Questions from
Building Construction
To construct a 10 cm thick partition wall, you will prefer
The construction joints in buildings are provided after
Pick up the correct statement from the following :
The pile which supports the load partly by friction and partly by resting on hard stratum, is called
Pick up the incorrect statement from the following :
Pick up the incorrect statement from the following :
Crown is located at
In soils possessing low bearing capacity, the type of foundation generally provided, is
Stability of an existing structure may be disturbed by
Pick up the correct statement from the following :
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments