CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Industrial Engineering and Production Management problems
1. PERT analysis is based upon
Options
A. optimistic time
B. pessimistic time
C. most likely time
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these
2. A systematic job improvement sequence will consist of
Options
A. motion study
B. time study
C. job enrichment
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these
3. In inventory control theory, the economic order quantity is
Options
A. average level of inventory
B. optimum lot size
C. capacity of a warehouse
D. lot size corresponding to break-even analysis
Show Answer
Scratch Pad
Discuss
Correct Answer: optimum lot size
4. The routing function in a production system design is concerned with
Options
A. manpower utilisation
B. quality assurance of the product
C. machine utilisation
D. optimising material flow through the plant
Show Answer
Scratch Pad
Discuss
Correct Answer: machine utilisation
5. Job evaluation is the method of determining the
Options
A. relative values of a job
B. worker's performance on a job
C. worth of the machine
D. value of overall production
Show Answer
Scratch Pad
Discuss
Correct Answer: relative values of a job
6. The aim of value engineering is to
Options
A. find the depreciation value of a machine
B. determine the selling price of a product
C. minimise the cost without change in quality of the product
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: minimise the cost without change in quality of the product
7. In big automobile repair shop, for elevating and moving the heavy parts such as complete engine assembly, gear box etc., an overhead crane and a fork lift truck is used.
Options
A. Yes
B. No
Show Answer
Scratch Pad
Discuss
Correct Answer: Yes
8. The main object of scientific layout is
Options
A. to produce better quality of product
B. to utilise maximum floor area
C. to minimise production delays
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these
9. In CPM, the cost slope is determined by
Options
A.
B.
C.
D.
Show Answer
Scratch Pad
Discuss
Correct Answer:
10. Work study involues
Options
A. only method study
B. only work measurement
C. method study and work measurement
D. only motion study
Show Answer
Scratch Pad
Discuss
Correct Answer: method study and work measurement
First
4
5
6
...
10
..
15
16
Last
More in Mechanical Engineering:
Automobile Engineering
Compressors, Gas Dynamics and Gas Turbines
Engineering Materials
Engineering Mechanics
Heat Transfer, Refrigeration and Air Conditioning
Hydraulic Machines
Hydraulics and Fluid Mechanics
IC Engines and Nuclear Power Plants
Industrial Engineering and Production Management
Machine Design
Production Engineering
Steam Boilers and Engines
Steam Nozzles and Turbines
Strength of Materials
Theory of machines
Thermodynamics
Workshop Technology