  • 1. Follow-up prescribes the sequence of operations to be followed.

  • Options
  • A. Correct
  • B. Incorrect
  • Discuss
  • 2. For material transportation, conveyors are used when the prevailing conditions include

  • Options
  • A. loads are uniform
  • B. routes do not vary
  • C. materials move relatively continuously
  • D. all of these
  • Discuss
  • 3. Which of the following statement is correct?

  • Options
  • A. When slack of an activity is zero, it falls only on critical path.
  • B. CPM technique is useful to minimise the direct and indirect expenses.
  • C. Critical path of a net work represents the minimum time required for completion of project.
  • D. all of the above
  • Discuss
  • 4. The purpose of micromotion study is to

  • Options
  • A. assist in finding out the most efficient way of doing work
  • B. train the individual operator regarding the motion economy principles
  • C. help in collecting the motion time data for synthetic time standards
  • D. all of the above
  • Discuss
  • 5. Slack represents the difference between the

  • Options
  • A. earliest completion time and latest allowable time
  • B. latest allowable time and earliest completion time
  • C. earliest completion time and normal expected time
  • D. latest allowable time and normal allowable time
  • Discuss
  • 6. The factors to be considered for production scheduling are

  • Options
  • A. component design
  • B. route sheet
  • C. time standards
  • D. all of these
  • Discuss
  • 7. In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker

  • Options
  • A. whose output exceeds 67% efficiency
  • B. on the percentage of time saved
  • C. on the percentage of time worked
  • D. on the percentage of standard time
  • Discuss
  • 8. The product layout

  • Options
  • A. lowers overall manufacturing time
  • B. requires less space for placing machines
  • C. utilises machine and labour better
  • D. all of these
  • Discuss
  • 9. Merit rating is the method of determining the

  • Options
  • A. relative values of a job
  • B. worker's performance on a job
  • C. worth of a machine
  • D. value of overall production
  • Discuss
  • 10. PERT stands for

  • Options
  • A. Programme Estimation and Reporting Technique
  • B. Process Estimation and Review Technique
  • C. Programme Evaluation and Review Technique
  • D. Planning Estimation and Resulting Technique
  • Discuss