CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Industrial Engineering and Production Management problems
1. Break even analysis represents the relationship between cost and volume.
Options
A. True
B. False
Show Answer
Scratch Pad
Discuss
Correct Answer: True
2. According to Muther, the basic principle of best layout is
Options
A. principle of over-all integration
B. principle of flow
C. principle of flexibility
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these
3. If (
R
) is the base rate guaranteed per hour, (
S
) is the standard time for the job and (
T
) is the actual time, then according to Halsey 50-50 plan, wages for the job will be
Options
A.
TR
B.
C.
TR
+ (
S
-
T
)
R
D.
Show Answer
Scratch Pad
Discuss
Correct Answer:
4. Product layout is used for
Options
A. job production
B. batch production
C. mass production
D. any one of these
Show Answer
Scratch Pad
Discuss
Correct Answer: mass production
5. Product layout is also known as
Options
A. analytical layout
B. synthetic layout
C. static product layout
D. none of these
Show Answer
Scratch Pad
Discuss
Correct Answer: synthetic layout
6. In fixed position layout
Options
A. total production cost is less
B. material movement is less
C. capital investment is minimum
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these
7. The time taken by a trained worker to perform an operation, while working a steady pace, is known as
Options
A. standard time
B. normal time
C. representative time
D. none of these
Show Answer
Scratch Pad
Discuss
Correct Answer: standard time
8. In product layout
Options
A. specialised and strict supervision is required
B. machines can not be used to their maximum capacity
C. manufacturing cost rises with a fall in the volume of production
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
9. Normal time is the ratio of representative time to the rating factor.
Options
A. True
B. False
Show Answer
Scratch Pad
Discuss
Correct Answer: False
10. An activity of the project is graphically represented by __________ on the network diagram.
Options
A. a circle
B. a straight line
C. an arrow
Show Answer
Scratch Pad
Discuss
Correct Answer: an arrow
First
15
16
Last
More in Mechanical Engineering:
Automobile Engineering
Compressors, Gas Dynamics and Gas Turbines
Engineering Materials
Engineering Mechanics
Heat Transfer, Refrigeration and Air Conditioning
Hydraulic Machines
Hydraulics and Fluid Mechanics
IC Engines and Nuclear Power Plants
Industrial Engineering and Production Management
Machine Design
Production Engineering
Steam Boilers and Engines
Steam Nozzles and Turbines
Strength of Materials
Theory of machines
Thermodynamics
Workshop Technology