  • 1. Process layout is employed

  • Options
  • A. where low volume of production is required
  • B. where similar jobs are manufactured on similar machines
  • C. where machines are arranged on functional basis
  • D. all of the above
  • Discuss
  • 2. Halsey plan of wage incentive

  • Options
  • A. is not applied to all level of workers
  • B. is applied to all level of workers
  • C. does not guarantee minimum wage
  • D. is based upon efficiency of worker
  • Discuss
  • 3. Travel charts are used to

  • Options
  • A. analyse material handling
  • B. determine inventory control difficulties
  • C. plan material handling procedure and routes
  • D. all of the above
  • Discuss
  • 4. If A is the total items consumed per year, P is the procurement cost per order, and C is the annual inventory carrying cost per item, then the most economic ordering quantity is given by

  • Options
  • A.
  • B.
  • C.
  • D.
  • Discuss
  • 5. Linear programming can be applied successfully to

  • Options
  • A. chemical industry
  • B. oil industry
  • C. banks
  • D. all of these
  • Discuss
  • 6. The value engineering technique in which experts of the same rank assemble for product development is called

  • Options
  • A. Delphi
  • B. brain storming
  • C. morphological analysis
  • D. direct expert comparison
  • Discuss
  • 7. PERT

  • Options
  • A. provides an approach for keeping planning up-to-date
  • B. provides a way for management to require that planning be done on a uniform and logical basis
  • C. permits management to foresee quickly the impact of variations from the plan
  • D. all of the above
  • Discuss
  • 8. Which one of the following techniques is used for determining allowances in time study?

  • Options
  • A. Acceptance sampling
  • B. Linear regression
  • C. Performance rating
  • D. Work sampling
  • Discuss
  • 9. CPM requires

  • Options
  • A. single time estimate
  • B. double time estimate
  • C. triple time estimate
  • D. none of these
  • Discuss
  • 10. For handling materials during manufacture of cement, a __________ is widely used.

  • Options
  • A. belt conveyor
  • B. bucket conveyor
  • C. fork lift truck
  • D. overhead crane
  • Discuss