CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Water Supply Engineering problems
1. The force which develops in a pressure conduit supported on trestles, is
Options
A. tension
B. compression
C. temperature stress
D. flexural stress.
Show Answer
Scratch Pad
Discuss
Correct Answer: flexural stress.
2. Surface water is obtained from
Options
A. well
B. springs
C. artesian well
D. rain.
Show Answer
Scratch Pad
Discuss
Correct Answer: rain.
3. Pick up the correct statement from the following regarding the pressure conduits :
Options
A. Pressure conduits are permitted to run
th full
B. Pressure conduits are always laid along down grades
C. The hydraulic gradient line always coincides the invert of the conduit
D. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: None of these.
4. Pick up the correct statement from the following regarding radial flow centrifugal pumps :
Options
A. These are provided with volute type or turbine type casings
B. In involute type of radial flow centrifugal pump, the impeller discharges into a gradually expanding spiral casing
C. In turbine type of radial flow centrifugal pumps, the impeller is surrounded by stationary guide vanes to reduce the velocity of water
D. The efficiency of turbine type of radial flow centrifugal pump, is always higher than that of volute type
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
5. Continuous flow of water can be expected from
Options
A. gravity springs
B. surface springs
C. artesian springs
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: artesian springs
6. A city supply includes
Options
A. domestic water demand
B. industrial and commercial water demands
C. demand for public uses and fire
D. water losses
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
7. Increase in population of a rapidly growing city, may be estimated by
Options
A. arithmetical mean method
B. geometrical method
C. incremental increase method
D. graphical comparison method.
Show Answer
Scratch Pad
Discuss
Correct Answer: geometrical method
8. Flow through period, in sedimentation tanks, is
Options
A. equal to detention period
B. more than detention period
C. less than detention period
D. detention period divided by displacement efficiency
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: less than detention period
9. The period of cleaning of a slow sand filter, is usually
Options
A. 5 to 10 days
B. two weeks to three weeks
C. one month to three months
D. three months to six months
E. one year.
Show Answer
Scratch Pad
Discuss
Correct Answer: one month to three months
10. To detect the turbidity of the order of 0 to 1000 P.P.M. the instrument used is
Options
A. turbidimeter
B. Jackson turbidimeter
C. Baylis turbidimeter
D. Hallige turbidimeter.
Show Answer
Scratch Pad
Discuss
Correct Answer: Baylis turbidimeter
First
10
11
12
...
23
..
35
36
Last
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering