CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Railways problems
1. Bending of rail ends due to loose packing under a joint and loose fish Bolts, is known
Options
A. buckling
B. hogging
C. creeping
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: hogging
2. If the stock rails are B.H. rails, the type of switch generally provided, is
Options
A. articulated
B. undercut
C. over riding
D. straight cut.
Show Answer
Scratch Pad
Discuss
Correct Answer: straight cut.
3. On B.G. tracks the distance of outer signal from station limit is kept
Options
A. 510 m
B. 520 m
C. 530 m
D. 540 m
E. 550 m
Show Answer
Scratch Pad
Discuss
Correct Answer: 540 m
4. If the standard length of a B.G. crossing is 597 cm, the number of crossing, is
Options
A. 1 in
B. 1 in 12
C. 1 in 16
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 1 in 12
5. Minimum gradient in station yards is generally limited to
Options
A. 1 in 1000
B. 1 in 750
C. 1 in 500
D. 1 in 400
E. zero
Show Answer
Scratch Pad
Discuss
Correct Answer: zero
6. Minimum composite sleeper index for wooden sleepers used over bridge girders, is
Options
A. 1455
B. 1355
C. 1255
D. 1155
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 1455
7. For inspection and packing of ballast, each pot sleeper is provided with
Options
A. one hole
B. two holes
C. three holes
D. four holes.
Show Answer
Scratch Pad
Discuss
Correct Answer: two holes
8. In a diamond crossing, number of noses are
Options
A. 2
B. 3
C. 4
D. 6
Show Answer
Scratch Pad
Discuss
Correct Answer: 6
9. The effective bearing area of all types of sleepers, is
Options
A. 0.40 m
2
B. 0.42 m
2
C. 0.44 m
2
D. 0.46 m
2
E. 0.50 m
2
Show Answer
Scratch Pad
Discuss
Correct Answer: 0.46 m
2
10. In Indian railways, the ratio of axle load and weight of rail, is
Options
A. 312
B. 412
C. 512
D. 600
Show Answer
Scratch Pad
Discuss
Correct Answer: 512
First
17
Last
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering