To design a cross-over between parallel tracks, the required components are :
two switch, points, two acute angle crossings and two check rails
two switch points, two acute angle crossings and four check rails
two switch points, two acute angle crossings and six check rails
none of these.
Correct Answer:
two switch points, two acute angle crossings and four check rails
← Previous Question
Next Question→
More Questions from
Railways
On a straight railway track, absolute levels at point A on two rails are 100.550 m and 100.530 m and the absolute levels at point B 100 m apart are 100.585 m and 100.515 m respectively, the value of twist of rails per metre run, is
A scissors cross-over consists of
Rail joint supported on a single sleeper, is known
Pick up the incorrect statement from the following:
The type of switch generally used for B.G. and M.G. tracks, is
Maximum wheel base distance provided on Indian B.G. tracks, is
The difference in the lengths of two diagonals of a rail diamond is
Overall depth of a dog spike, is
Mr. W. Simms, the consulting Engineer to the Government of India recommended the gauge for Indian railways
The sleepers which satisfy the requirements of an ideal sleeper, are