Pick up the correct statement from the following :
The specified duration of unit hydrograph, is called unit duration
The rain during specified duration, is called unit storm
A unit hydrograph for a particular unit duration may be utilised for evaluating the run off hydrographs of other storms of like durations
The number of unit hydrographs for a given basin, is theoretically infinite
All the above.
Correct Answer:
All the above.
← Previous Question
Next Question→
More Questions from
Water Resources Engineering
If total run off of a basin of 50 hectares is 0.8 cm, the ordinate of Bernard's distribution graph, may be calculated by the formula (where Q is the discharge in cumecs at the given time)
A well is sunk in an unconfined aquifer having a saturated depth of 100 m. Assuming the equilibrium flow conditions and a homogeneous aquifer and radius of influence to be same, the ratio of discharges at 20 m and 40 m draw downs, is
Pick up the correct statement from the following :
Discharge curve may be extended by logarithmic method if
Phytometer method is generally used for the measurement of
If the grain size of soil increases
Hydrology is the science which deals with
The polythene bottles are used for collecting rain water and. their capacities is
According to Thiem, the permeability of an aquifer may be obtained from the equation
The Dupuit formula is based on