Surveying Questions
Practice Surveying MCQs with answers and explanations. Page 7 of 18.
Category
Civil Engineering
Topic
Surveying
Page
7 / 18
Mode
Practice
Questions
Open any question to view the answer and explanation.
Highway / railway curves — the “Point of Curve (PC)” of a simple circular curve refers to which location on the alignment?
Choose the most accurate definition.
Open
View answer
Theodolite adjustments — a theodolite is said to be in perfect adjustment when which conditions hold?
Select the most comprehensive option.
Open
View answer
Area by ordinates — Simpson’s 1/3 rule for a curvilinear boundary divided into an even number of equal-width strips states that the area equals:
Identify the correct coefficient pattern for extreme, odd, and even offsets.
Open
View answer
Reciprocal levelling — which source of error is NOT completely eliminated by reciprocal levelling across an obstacle?
Choose the correct option.
Open
View answer
Verniers — if the smallest division of a vernier scale is longer than the smallest division of the main (primary) scale, what type of vernier is it?
Select the correct name.
Open
View answer
Tacheometry — why is vertical staff holding generally preferred over normal (perpendicular) staffing during tacheometric observations?
Choose the most appropriate reason.
Open
View answer
Mass haul (mass diagram) — identify the correct statements about slope sign, volume interpretation, and haul from a mass diagram.
Choose the most comprehensive option.
Open
View answer
Geomagnetism in surveying — what is the term for an imaginary line that passes through all points on the Earth having equal magnetic declination?
Choose the correct term.
Open
View answer
Level vs horizontal — which statements correctly describe level surfaces/lines and horizontal surfaces/lines in geodetic terms?
Choose the most comprehensive option.
Open
View answer
Earthwork Quantity Computation – Valid Methods Used in Highway and Irrigation Projects
In engineering surveying and quantity estimation, the volume of earthwork between two cross-sections (or between multiple sections) may be calculated using which of the following established methods?
Open
View answer
Optical Survey Instruments – Features of an Internal Focusing Telescope
Which of the following statements correctly describe an internal focusing telescope used on theodolites and levels?
Open
View answer
Plane Table Resection – When Is the Three-Point “Fix” Most Reliable?
While fixing a plane-table station by the three-point problem with three known points plotted on the sheet, the quality of the fix is best under which geometric condition?
Open
View answer
Telescope Eyepieces – Construction of the Ramsden Eyepiece Used in Survey Instruments
Which component arrangement correctly describes a Ramsden eyepiece commonly used on surveying telescopes?
Open
View answer
Parallax in Survey Telescopes – Correct Procedure to Remove It Completely
To eliminate parallax so that the image of the object and the cross-hairs lie in the same focal plane, which focusing steps must be correctly performed?
Open
View answer
Chaining on Slopes – When Can Slope Correction Be Neglected in Practice?
Under typical site accuracy requirements, the slope-to-horizontal correction in chaining can be ignored in which of the following practical cases?
Open
View answer
Transit Vernier Reading – Smallest Readable Angle from Plate and Vernier Data
The main (horizontal) plate of a transit is divided into 1080 equal divisions. If 60 vernier divisions coincide exactly with 59 main plate divisions, what is the smallest angle that can be read accurately (least count)?
Open
View answer
Bearings – Convert a Whole Circle Bearing to a Reduced (Quadrantal) Bearing
A line has a whole circle bearing (WCB) of 290°. What is its reduced bearing (RB) expressed in quadrant notation?
Open
View answer
Simple Survey Tools – Primary Use of a Cross-Staff in Chain Surveying
In chain and offset surveying, the basic cross-staff is primarily used for which operation on the ground?
Open
View answer
Vernier Scales – Definition of Least Count for a Direct Vernier
What is the correct expression for the least count of a vernier scale in relation to the main (primary) scale divisions?
Open
View answer
Surveying and error theory: how do random (accidental) errors accumulate as the number of independent observations/operations increases?
Choose the most accepted proportionality used for precision estimates in civil engineering measurements.
Open
View answer
Practice smarter
Solve a few questions daily and revisit weak topics regularly to improve accuracy.