Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Surveying
The additional lines which are measured to show the correctness of the chain surveying are called:
check clines
proof lines
tie lines
all of these.
Correct Answer:
all of these.
← Previous Question
Next Question→
More Questions from
Surveying
If h1 and h2 are the differences in level between ground and the formation levels, m is the slope of the sloping sides. D is the distance between the cross sections then, prismoidal correction for a level section is
If F is the pull applied at the ends of tape in kg, l is the length of tape between end marks in metres, w is the weight of the tape in kg per metre run, then sag correction
The reduced level of a floor is 99.995 m, the staff reading on the floor is 1.505 m. If the inverted staff reading against the roof is 1.795 m, the floor level below the slab, is
The line normal to the plumb line is known as
Planimeter is used for measuring
Resolving power of a telescope depends on
The included angles of a theodolite traverse, are generally measured
If deflection angles are measured in a closed traverse, the difference between the sum of the right-hand and that of the left hand angles should be equal to
In a perfect prismatic compass
Under ordinary conditions, the precision of a theodolite traverse is affected by
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments