The saturation line is the line up to which banks get saturated after the canal runs for some time. The saturation gradient in ordinary loam soil, is generally
2 : 1
3 : 1
4 : 1
5 : 1
6 : 1
Correct Answer:
4 : 1
← Previous Question
Next Question→
More Questions from
Irrigation
Pick up the correct statement from the following
The crest level of a canal diversion head work, depends upon
The top soil of a water logged field becomes more alkaline and infertile if its pH value is
Irrigation canals are generally aligned along
The measure to remove water logging of land, is
Retrogression of the bed level of a river downstream a weir, occurs due to
The depth of the crest of a scouring sluice below the crest of a head regulator, is generally kept
For a given discharge in a channel, Blench curves give the relationship between the loss of head (HL) and
Pick up the incorrect statement from the following. Culturable commanded area is the gross area of an irrigation canal system less
The sinuosity of a meander is the ratio of