Crown is located at
highest point on the extrados of the arch
highest point on the intrados of the arch
skew-back of the arch
none of these.
Correct Answer:
highest point on the extrados of the arch
← Previous Question
Next Question→
More Questions from
Building Construction
In soils possessing low bearing capacity, the type of foundation generally provided, is
Stability of an existing structure may be disturbed by
Pick up the correct statement from the following :
A floor constructed with the 4 to 6 mm marble chips, is known
Pick up the correct statement from the following :
Pick up the correct statement from the following :
The local swelling of a finished plaster, is termed
The voussoir placed at crown of an arch, is known as a
The pile which supports the load due to friction between pile face and surrounding soil, is generally known as
The minimum thickness of walls built in cement mortar (1 : 6) for a single storey building, is