Difficulty: Easy
Correct Answer: Both I and II follow
Explanation:
Introduction / Context:
The scenario indicates a direct hazard from malfunctioning signals, leading to fatal and serious accidents. Immediate and long-term remedies are required.
Given Data / Assumptions:
Concept / Approach:
In risk control, implement interim controls immediately and permanent fixes as soon as practicable. Posting personnel provides immediate mitigation; repairing/replacing signals provides systemic resolution.
Step-by-Step Solution:
Verification / Alternative check:
Best practice in safety engineering: temporary administrative controls (manual direction) + engineering controls (repair/replace) together minimize risk.
Why Other Options Are Wrong:
Common Pitfalls:
Relying on only one measure; delaying permanent fixes; underestimating manual control value during outages.
Final Answer:
Both I and II follow