  • 1. CPM stands for

  • Options
  • A. Combined Process Method
  • B. Critical Path Method
  • C. Common Planning Method
  • D. Critical Process Method
  • Discuss
  • 2. The mathematical technique for finding the best use of limited resources of a company in the maximum manner is known as

  • Options
  • A. value analysis
  • B. network analysis
  • C. linear programming
  • D. queuing theory
  • Discuss
  • 3. Scheduling

  • Options
  • A. prescribes the sequence of operations to be followed
  • B. determines the programme for the operations
  • C. is concerned with starting of processes
  • D. regulates the progress of job through various processes
  • Discuss
  • 4. Time study is carried out

  • Options
  • A. by finding all the significant informations regarding the job, work place and machine tool etc.
  • B. by breaking up each operation into small elements which are measurable with the help of the measuring device accurately
  • C. by observing and recording the time taken by the operator for an operation
  • D. all of the above
  • Discuss
  • 5. In a functional organisation

  • Options
  • A. quality of work is better
  • B. wastage of material is minimum
  • C. specialised knowledge and guidance to individual worker is provided
  • D. all of the above
  • Discuss
  • 6. Valve analysis is particularly of interest when

  • Options
  • A. jobbing work economics are involved
  • B. production is on large scale
  • C. only few components are involved
  • D. costly equipment is used
  • Discuss
  • 7. Standard time is equal to

  • Options
  • A. normal time minus allowances
  • B. normal time plus allowances
  • C. representative time multiplied by rating factor
  • D. normal time taken by an operation
  • Discuss
  • 8. The average time recorded by work study man for an operation is called

  • Options
  • A. standard time
  • B. normal time
  • C. representative time
  • D. none of these
  • Discuss
  • 9. Gantt chart gives information about

  • Options
  • A. scheduling and routing
  • B. sales
  • C. production schedule
  • D. machine utilisation
  • Discuss
  • 10. Which of the following are the principles of material handling?

  • Options
  • A. keep all the handling to the minimum
  • B. select only efficient handling equipment
  • C. move the heaviest weight to the least distance
  • D. all of the above
  • Discuss