CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Building Construction problems
1. While investigating the site, a thick layer of fairly firm clay over a deep layer of soft clay is encountered. In such a situation, the following type of foundation is useful :
Options
A. pile formation
B. raft foundation
C. grillage foundation
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: raft foundation
2. Herringbone bond is used for
Options
A. walls having thickness more than 4 bricks
B. architectural finish to the face work
C. ornamental panels in brick flooring
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
3. If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is
Options
A. 12
B. 18
C. 24
D. 25
E. 30.
Show Answer
Scratch Pad
Discuss
Correct Answer: 24
4. The vertical member running through middle of a shutter frame, is
Options
A. style
B. reveal
C. mullion
D. post.
Show Answer
Scratch Pad
Discuss
Correct Answer: mullion
5. A temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as
Options
A. scaffolding
B. dead shore
C. raking shore
D. under pinning.
Show Answer
Scratch Pad
Discuss
Correct Answer: scaffolding
6. The inner section of a cavity wall, is generally known as
Options
A. butress
B. leaf wall
C. pillaster
D. pillar.
Show Answer
Scratch Pad
Discuss
Correct Answer: leaf wall
7. Pick up the correct statement from the following :
Options
A. the sand in the sand pile is well compacted
B. the sand is kept moist at the time of placing and tamping
C. the top one metre of the pile is filled up with cement concrete to provide a cap for the filled up sand
D. sand piles are generally used under column loads
E. all of the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above.
8. The depth of concrete bed of the foundation depends upon
Options
A. the projection of the concrete block beyond the footing over it
B. the upward soil pressure
C. the mix of the concrete
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
9. If
a
is the offset of concrete bed in cms, and
d
is the depth of concrete bed in cms, then
Options
A.
d
= 0.445
a
B. 0.557
a
C.
d
= 0.775
a
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer:
d
= 0.775
a
10. The depth of excavation of foundations, is generally measured with a
Options
A. ranging rod
B. steel tape
C. levelling staff
D. bonning rod.
Show Answer
Scratch Pad
Discuss
Correct Answer: bonning rod.
First
12
13
14
...
18
..
22
23
Last
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering