Pick up the correct statement from the following:
A projecting piece usually provided to support a truss, is
To ensure that supporting area of an offset footing of a boundary wall is fully compressive, the C.G. of load must act
The raft slab is projected beyond the outer walls of the structure by
The form work from the underside of slabs, can be removed only after
Pick up the incorrect statement from the following :
During percussion drilling
If (φ) is the angle of repose of soil of weight w kg/m3, the horizontal pressure p at a depth of h metres per metre length of wall, is
The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed
For providing a raft foundation, the following activities are involved ramming the foundation bed excavation of the soil upto required depth laying the reinforcement over the foundation bed curing the cement concrete placed over reinforcement pouring the cement concrete over the reinforcement. The correct sequence is
You are asked to design and supervise a truss for a factory to have spans 6 m to 9 m. The type of the truss you will use, is
Pick up the correct statement from the following :
The arrangement of supporting an existing structure by providing supports underneath, is known as
The 19 cm x 9 cm side of a brick as seen in the wall face, is generally known as
Cavity wall is generally provided for
Depth of lean concrete bed placedat the bottom of a wall footing, is kept
Exposed portions of vertical surface at right angles to the door or window frame, are known as
The opening provided in sloping roof with its top parallel to the roof surface, is called
The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as
Rotary drilling