The minimum width of a stair in residential buildings, is
The Auger boring method is not suitable for
A pre-stressed concrete pile is
Pick up the correct statement from the following :
The vertical sides of a door and window openings provided in a wall, are known as
The bond in which headers and stretchers are laid in alternate courses and every stretcher course is started with a three fourth brick bat, is known as
Suitable spacing of timber piles, is
Weep holes are provided in retaining and breast walls
The X-ray rooms are plastered with
An ordinary concrete may be made water proof by adding
Gravels
The piece of a brick cut along the centre of width in such a way that its length is equal to that of full brick, is called
Pick up the correct statement from the following:
The process of working a flat for the finishing coat, is known
The bearing capacity of granite is generally
The width of the hollow space between two walls of a cavity wall should not exceed
A stair should not have pitch more than
Pick up the correct statement from the following :
Pick up the correct statement from the following :
Brick nogging type of partition wall, is constructed by