The long-term national road development program known as the Bombay Road Plan (formulated around August 1958) covered what total planning period?
-
A5 years
-
B10 years
-
C15 years
-
D20 years
-
E25 years
Answer
Correct Answer: 20 years
Explanation
Introduction / Context:India’s road development evolved through sequential long-term plans. After the Nagpur Plan, the Bombay Road Plan set ambitious targets for national, state, and rural roads. Understanding the duration of each plan is a staple exam topic in transportation engineering.
Given Data / Assumptions:
- Plan name: Bombay Road Plan.
- Formulation period: around August 1958, with implementation widely referenced as 1961–1981.
Concept / Approach:Both the Nagpur (20-year) and Bombay (20-year) plans framed network expansion over two decades. The Bombay Plan is commonly cited for a 20-year horizon (1961–1981) even though the formulation discussions began earlier.
Step-by-Step Solution:Recall plan durations from standard syllabi.Select 20 years for the Bombay Road Plan.
Verification / Alternative check:Multiple exam prep texts and historical summaries attribute a 20-year period to the Bombay Plan.
Why Other Options Are Wrong:
- 5, 10, 15, 25 years: do not match the canonical 20-year planning horizon.
Common Pitfalls:Confusing plan formulation year with execution window; mixing figures from the later Lucknow Plan.
Final Answer:20 years