According to the average speed formula,
P = 1/4, Q =3/5, R = 3/20
x = 8 km/h, y = 6 km/h, z = 10km/h
? Required average speed = 1 / [(P/x) + (Q/y) + (R/z)]
=1 / [(1/32) + (1/10) + (3/200)]
= 1/[(25 + 80 + 12)/800]
= 800/117
= 6.83 km/h
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.