CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Mechanical Engineering
‣
Industrial Engineering and Production Management
Comments
Question
Process layout is employed
Options
A. where low volume of production is required
B. where similar jobs are manufactured on similar machines
C. where machines are arranged on functional basis
D. all of the above
Correct Answer
all of the above
Industrial Engineering and Production Management problems
Search Results
1. An activity of the project is graphically represented by __________ on the network diagram.
Options
A. a circle
B. a straight line
C. an arrow
Show Answer
Scratch Pad
Discuss
Correct Answer: an arrow
2. Normal time is the ratio of representative time to the rating factor.
Options
A. True
B. False
Show Answer
Scratch Pad
Discuss
Correct Answer: False
3. In product layout
Options
A. specialised and strict supervision is required
B. machines can not be used to their maximum capacity
C. manufacturing cost rises with a fall in the volume of production
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
4. The time taken by a trained worker to perform an operation, while working a steady pace, is known as
Options
A. standard time
B. normal time
C. representative time
D. none of these
Show Answer
Scratch Pad
Discuss
Correct Answer: standard time
5. In fixed position layout
Options
A. total production cost is less
B. material movement is less
C. capital investment is minimum
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these
6. Halsey plan of wage incentive
Options
A. is not applied to all level of workers
B. is applied to all level of workers
C. does not guarantee minimum wage
D. is based upon efficiency of worker
Show Answer
Scratch Pad
Discuss
Correct Answer: is applied to all level of workers
7. Travel charts are used to
Options
A. analyse material handling
B. determine inventory control difficulties
C. plan material handling procedure and routes
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
8. If
A
is the total items consumed per year,
P
is the procurement cost per order, and
C
is the annual inventory carrying cost per item, then the most economic ordering quantity is given by
Options
A.
B.
C.
D.
Show Answer
Scratch Pad
Discuss
Correct Answer:
9. Linear programming can be applied successfully to
Options
A. chemical industry
B. oil industry
C. banks
D. all of these
Show Answer
Scratch Pad
Discuss
Correct Answer: all of these
10. The value engineering technique in which experts of the same rank assemble for product development is called
Options
A. Delphi
B. brain storming
C. morphological analysis
D. direct expert comparison
Show Answer
Scratch Pad
Discuss
Correct Answer: brain storming
Comments
There are no comments.
Enter a new Comment
Save
More in Mechanical Engineering:
Automobile Engineering
Compressors, Gas Dynamics and Gas Turbines
Engineering Materials
Engineering Mechanics
Heat Transfer, Refrigeration and Air Conditioning
Hydraulic Machines
Hydraulics and Fluid Mechanics
IC Engines and Nuclear Power Plants
Industrial Engineering and Production Management
Machine Design
Production Engineering
Steam Boilers and Engines
Steam Nozzles and Turbines
Strength of Materials
Theory of machines
Thermodynamics
Workshop Technology