logo

CuriousTab

CuriousTab

Discussion


Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • Normal time is the ratio of representative time to the rating factor.


  • Options
  • A. True
  • B. False

  • Correct Answer
  • False 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. In product layout

    • Options
    • A. specialised and strict supervision is required
    • B. machines can not be used to their maximum capacity
    • C. manufacturing cost rises with a fall in the volume of production
    • D. all of the above
    • Discuss
    • 2. The time taken by a trained worker to perform an operation, while working a steady pace, is known as

    • Options
    • A. standard time
    • B. normal time
    • C. representative time
    • D. none of these
    • Discuss
    • 3. In fixed position layout

    • Options
    • A. total production cost is less
    • B. material movement is less
    • C. capital investment is minimum
    • D. all of these
    • Discuss
    • 4. Product layout is also known as

    • Options
    • A. analytical layout
    • B. synthetic layout
    • C. static product layout
    • D. none of these
    • Discuss
    • 5. Product layout is used for

    • Options
    • A. job production
    • B. batch production
    • C. mass production
    • D. any one of these
    • Discuss
    • 6. An activity of the project is graphically represented by __________ on the network diagram.

    • Options
    • A. a circle
    • B. a straight line
    • C. an arrow
    • Discuss
    • 7. Process layout is employed

    • Options
    • A. where low volume of production is required
    • B. where similar jobs are manufactured on similar machines
    • C. where machines are arranged on functional basis
    • D. all of the above
    • Discuss
    • 8. Halsey plan of wage incentive

    • Options
    • A. is not applied to all level of workers
    • B. is applied to all level of workers
    • C. does not guarantee minimum wage
    • D. is based upon efficiency of worker
    • Discuss
    • 9. Travel charts are used to

    • Options
    • A. analyse material handling
    • B. determine inventory control difficulties
    • C. plan material handling procedure and routes
    • D. all of the above
    • Discuss
    • 10. If A is the total items consumed per year, P is the procurement cost per order, and C is the annual inventory carrying cost per item, then the most economic ordering quantity is given by

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss


    Comments

    There are no comments.

Enter a new Comment