logo

CuriousTab

CuriousTab

Discussion


Home Mechanical Engineering Industrial Engineering and Production Management Comments

  • Question
  • PERT is applied for


  • Options
  • A. marketing programmes and advertising programmes
  • B. installation of machinery
  • C. research and development of products
  • D. all of these

  • Correct Answer
  • all of these 


  • Industrial Engineering and Production Management problems


    Search Results


    • 1. Time study is used to

    • Options
    • A. determine standard costs
    • B. determine the number of machines a person may run
    • C. provide a basis for setting piece price or incentive wages
    • D. all of the above
    • Discuss
    • 2. Service time in queuing theory is usually assumed to follow

    • Options
    • A. normal distribution
    • B. Poissons distribution
    • C. Erlang distribution
    • D. exponential law
    • Discuss
    • 3. Generally PERT is preferred over CPM for the purpose of project evaluation.

    • Options
    • A. Yes
    • B. No
    • Discuss
    • 4. A feasible solution to the linear programming problem should

    • Options
    • A. satisfy the problem constraints
    • B. optimise the objective function
    • C. satisfy the problem constraints and non-negativity restrictions
    • D. satisfy the non-negativity restrictions
    • Discuss
    • 5. The most important function of inventory control is

    • Options
    • A. stock control system
    • B. to run the stores effectively
    • C. technical responsibility for the state of materials
    • D. all of the above
    • Discuss
    • 6. Monte Carlo solution in queuing theory is extremely useful in queuing problems that can not be analysed mathematically.

    • Options
    • A. Agree
    • B. Disagree
    • Discuss
    • 7. The factors which are to be considered while developing a good wage incentive plan will include

    • Options
    • A. adequate incentive
    • B. ease of administration
    • C. guaranteed basic pay
    • D. all of these
    • Discuss
    • 8. The start or completion of task is called

    • Options
    • A. an event
    • B. an activity
    • C. a duration
    • D. none of these
    • Discuss
    • 9. The process capability of a machine is defined as the capability of the machine to

    • Options
    • A. produce a definite volume of work per minute
    • B. perform definite number of operations
    • C. produce job at a definite spectrum of speed
    • D. hold a definite spectrum of tolerance and surface finish
    • Discuss
    • 10. Abbreviated work factor data is applied for

    • Options
    • A. material handling operation
    • B. maintenance operation
    • C. packing and shipping operation
    • D. all of these
    • Discuss


    Comments

    There are no comments.

Enter a new Comment