CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Mechanical Engineering
‣
Industrial Engineering and Production Management
Comments
Question
The average time recorded by work study man for an operation is called
Options
A. standard time
B. normal time
C. representative time
D. none of these
Correct Answer
representative time
Industrial Engineering and Production Management problems
Search Results
1. Standard time is equal to
Options
A. normal time
minus
allowances
B. normal time
plus
allowances
C. representative time multiplied by rating factor
D. normal time taken by an operation
Show Answer
Scratch Pad
Discuss
Correct Answer: normal time
plus
allowances
2. Valve analysis is particularly of interest when
Options
A. jobbing work economics are involved
B. production is on large scale
C. only few components are involved
D. costly equipment is used
Show Answer
Scratch Pad
Discuss
Correct Answer: production is on large scale
3. In a functional organisation
Options
A. quality of work is better
B. wastage of material is minimum
C. specialised knowledge and guidance to individual worker is provided
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
4. Time study is carried out
Options
A. by finding all the significant informations regarding the job, work place and machine tool etc.
B. by breaking up each operation into small elements which are measurable with the help of the measuring device accurately
C. by observing and recording the time taken by the operator for an operation
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
5. Scheduling
Options
A. prescribes the sequence of operations to be followed
B. determines the programme for the operations
C. is concerned with starting of processes
D. regulates the progress of job through various processes
Show Answer
Scratch Pad
Discuss
Correct Answer: determines the programme for the operations
6. Gantt chart gives information about
Options
A. scheduling and routing
B. sales
C. production schedule
D. machine utilisation
Show Answer
Scratch Pad
Discuss
Correct Answer: production schedule
7. Which of the following are the principles of material handling?
Options
A. keep all the handling to the minimum
B. select only efficient handling equipment
C. move the heaviest weight to the least distance
D. all of the above
Show Answer
Scratch Pad
Discuss
Correct Answer: all of the above
8. The correct sequence of phases in value engineering is
Options
A. creative phase, information phase, investigation phase, evaluation phase
B. information phase, creative phase, investigation phase, evaluation phase
C. investigation phase, information phase, creative phase, evaluation phase
D. creative phase, investigation phase, evaluation phase, information phase
Show Answer
Scratch Pad
Discuss
Correct Answer: creative phase, information phase, investigation phase, evaluation phase
9. Micromotion study is
Options
A. analysis of one stage of motion chart
B. motion study, when seen on a time chart
C. subdivision of an operation into therbligs and their analysis
D. enlarged view of motion study
Show Answer
Scratch Pad
Discuss
Correct Answer: subdivision of an operation into therbligs and their analysis
10. Dummy activities are used to
Options
A. determine the critical path
B. determine the project completion time
C. maintain the required net work
D. none of these
Show Answer
Scratch Pad
Discuss
Correct Answer: maintain the required net work
Comments
There are no comments.
Enter a new Comment
Save
More in Mechanical Engineering:
Automobile Engineering
Compressors, Gas Dynamics and Gas Turbines
Engineering Materials
Engineering Mechanics
Heat Transfer, Refrigeration and Air Conditioning
Hydraulic Machines
Hydraulics and Fluid Mechanics
IC Engines and Nuclear Power Plants
Industrial Engineering and Production Management
Machine Design
Production Engineering
Steam Boilers and Engines
Steam Nozzles and Turbines
Strength of Materials
Theory of machines
Thermodynamics
Workshop Technology